U
Unsthable
17 Jun 2025 16:04
Link
I am asking Andy for specifics information that should probably be in Documentation regarding the maintenance of Wind Farms. It is entirely possible that the information is already published and I have just missed it, but finding accurate information is unfortunately sometimes a challenge here.
I would like to know specifically in detail what the monthly requirements are for proper Wind Farm maintenance in terms of both products and employees.
In a post last year, Andy posted that the annual maintenance cost of a Wind Farm is:
(12) Wind Turbines
(450) Electric Power
(12000) Services
(18000) High Tech Services
(6000) Other Products
It was also listed that '320 workers and professionals are working at each windfarm and take care of the maintenance'.
Please verify that this is still accurate and specify what the 'Other Products' are as well as the breakdown of specific employee type distribution is for those 320 workers and professionals to allow for proper determination as to just how worth it (or not worth it) Wind Farm adoption is. Quick estimates based on your shared maintenance costs and assuming all employees are HT Engineers, the cost for the 'Other Products' would be considerably higher than for the Wind Turbines themselves based on the Cash Log data that I have from testing in my country.
I would like to know specifically in detail what the monthly requirements are for proper Wind Farm maintenance in terms of both products and employees.
In a post last year, Andy posted that the annual maintenance cost of a Wind Farm is:
(12) Wind Turbines
(450) Electric Power
(12000) Services
(18000) High Tech Services
(6000) Other Products
It was also listed that '320 workers and professionals are working at each windfarm and take care of the maintenance'.
Please verify that this is still accurate and specify what the 'Other Products' are as well as the breakdown of specific employee type distribution is for those 320 workers and professionals to allow for proper determination as to just how worth it (or not worth it) Wind Farm adoption is. Quick estimates based on your shared maintenance costs and assuming all employees are HT Engineers, the cost for the 'Other Products' would be considerably higher than for the Wind Turbines themselves based on the Cash Log data that I have from testing in my country.