M
madpraxis722
12 Jul 2013 02:28
Link
So, common markets...Trying to make it so my little empire of me and an ex c3 are supplying my country as much as possible.
I went through and set the quantity reserved percentage to 90% in both countries CM screens, set up all my contracts for country and companies in both countries, then go back and either don't touch the amount reserved if its at 90% and if its lower I round up the contract amount percentage up to the closest 5% mark (and in some cases like the schools companies I inherited at the CM lower limit of 10%).
Now my problem is this: I whip out my calculator and go to town. For example, in my slave's CM screen right now is a coal plant. Its estimated production is 1.8 million whatsits. Ok, amount already accepted is 66.11%, no problem, I'll enter 1260000 (70% for the record) in offered in contracts column. Repeat down the list as needed.
Hit confirm.
Screen loads back up and my coal company is now offering 2197500 units...wait..what? And the amounts I entered in every bloody single column that was selling below 90% have been tweaked to funky (as in no relation to what I entered) numbers too, and the ones that where selling 90% are all way the hell over the estimated production rates. Mind, there are one or two that actually took the numbers I entered and kept them (which is really messing with my mind...).
So...what the hell is happening here. I'm actually getting annoyed with this since I've gotten to the point where I don't even need the calculator because I wrote the numbers down after the 10th or 12th time of doing this. And I haven't even gone over to my main and tried this yet with its 3 or 4x the amount of corporations because no matter how much I enjoy the anal retentiveness of making my percentages rounded off (I really do), I don't want to do all over and over and over and over...ad nauseam...
Someone with more nerd mojo then me tell me what the hell I'm doing wrong and how to go about fixing it so I can get back to making numbers fit into my happy places >.>
I went through and set the quantity reserved percentage to 90% in both countries CM screens, set up all my contracts for country and companies in both countries, then go back and either don't touch the amount reserved if its at 90% and if its lower I round up the contract amount percentage up to the closest 5% mark (and in some cases like the schools companies I inherited at the CM lower limit of 10%).
Now my problem is this: I whip out my calculator and go to town. For example, in my slave's CM screen right now is a coal plant. Its estimated production is 1.8 million whatsits. Ok, amount already accepted is 66.11%, no problem, I'll enter 1260000 (70% for the record) in offered in contracts column. Repeat down the list as needed.
Hit confirm.
Screen loads back up and my coal company is now offering 2197500 units...wait..what? And the amounts I entered in every bloody single column that was selling below 90% have been tweaked to funky (as in no relation to what I entered) numbers too, and the ones that where selling 90% are all way the hell over the estimated production rates. Mind, there are one or two that actually took the numbers I entered and kept them (which is really messing with my mind...).
So...what the hell is happening here. I'm actually getting annoyed with this since I've gotten to the point where I don't even need the calculator because I wrote the numbers down after the 10th or 12th time of doing this. And I haven't even gone over to my main and tried this yet with its 3 or 4x the amount of corporations because no matter how much I enjoy the anal retentiveness of making my percentages rounded off (I really do), I don't want to do all over and over and over and over...ad nauseam...
Someone with more nerd mojo then me tell me what the hell I'm doing wrong and how to go about fixing it so I can get back to making numbers fit into my happy places >.>